• To be consistent with the final plans
• Consistent with any Sydney Water Approval Requirements
• Structural Site inspection of the existing structures to ensure they are structurally adequate to support the new loading (Charge separate if required)
• Pursuant and following Clause B.6 and E of Terms and Conditions