Hydraulic Engineering

(0 review)

• Prepared civil/stormwater engineer
• To be consistent with the final architectural plan
• Accordance with the requirements of Clause 2.1 of Council’s adopted stormwater Management Policy(SMP) and AS/NZ 3500.3.2003
• Pursuant and following section 4.4 of VNdraft Pty Ltd's Terms and Conditions

6.40 6.4 AUD 6.40

0.00

  • - Number of storey
  • - Additional level
  • - Estimate floor area
  • - OSD inspection & certification
  • - Type of development

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days